The Dubai Canal project is located in the heart of Dubai at Business Bay. The project consists of bulk excavation work for the new Canal. In last stage EMW removed the final bunds at the end of the canal, thereby connecting the new canal with the existing Dubai Creek.

Project details
Client Besix
Period 2016-2016
Location Dubai, UAE
Type of activities
  • Dry bulk excavations
  • Bund removal in wet
  • Compaction

EMW excavated the 3.2 km canal that connected the canal with the existing Dubai Creek and Arabian Sea.

  • Excavation works
  • Hauling of suitable material to the coastal area
  • Hauling of unsuitable material to a landfill